This project relates to 2no. Energy centres in barking. 1no. is existing and being upgraded and the new building energy centre which is currently under construction. The new build energy centre will be lead EC with the existing being utilised as support and resilient back up to the scheme
Stage 5 Design (BMS & Electrical)
Early enabling works
Main electrical incomer
Dilapidation reports on existing EC to define the BMS & Elec upgrade
Electrical Infrastructure
11Kv transformer incomer to primary DB’s
All sub circuit’s
Containment
Site wide controls systems
For district heating scheme and CHP (combined heat and power)